NOTE 1:
The suitability for any granny flat to be submitted to council as part of a Complying Development Process (Guaranteed 10 day approval process) is determined in Stage 2.
If a Complying Development Application is not suitable for the site, a Development Application and Construction Certificate needs to be lodged.
Development Application and Construction Certificate Applications will be subject to an Aspect Z fee proposal to prepare additional council documentation
NOTE 2:
Costs for architectural plans are included in overall costs outlined in stage 2.
The amount is non refundable in the case of construction not proceeding or works not proceeding beyond Stage 3.
Costs for Design Fee: $2500 + GST for CDC Application of standard design. $3500 for Development Application of standard design. Prices on application for custom design.
NOTE 3:
Costs for architectural plans are included in overall costs paid in Stage 3.
Additional costs (Refer to hourly rates) are applicable only with changes from standard design of any particular granny flat model after the agreement has been signed.
NOTE 4:
Any additional site specific requirements will be notified at this point and can include the requirement for consultant input on the following:
Bushfire Management/Acid Sulphate soils/Flooding (including but not limited to). Costs for any of these additional consultant items are required to be met directly by the client.